News from All Over the Web
|
Home >
News >
NewsLinks

Search results for 'Lower +North +Island' - Page: 2
| Stuff.co.nz - 16 Sep (Stuff.co.nz) The weather will start to shift on Wednesday as northwesterly winds pick up over the South Island and the lower parts of the North Island. Read...Newslink ©2025 to Stuff.co.nz |  |
|  | | RadioNZ - 10 Sep (RadioNZ) Squally thunderstorms with winds of up to 110km/h are expected to hit the lower North Island on Wednesday afternoon and evening. Read...Newslink ©2025 to RadioNZ |  |
|  | | RadioNZ - 8 Sep (RadioNZ) Train services in the region are on track to double peak-time services within five years. Read...Newslink ©2025 to RadioNZ |  |
|  | | Stuff.co.nz - 8 Sep (Stuff.co.nz) Eighteen battery electric multiple unit trains which will replace the diesel locomotives in the area from 2030. Read...Newslink ©2025 to Stuff.co.nz |  |
|  | | RadioNZ - 5 Sep (RadioNZ) High winds hit parts of the North Island, while heavy rain and snow are forecast in the South. Read...Newslink ©2025 to RadioNZ |  |
|  | | ITBrief - 4 Sep (ITBrief) Josh Weber joins Gallagher Security as Technical Account Manager, enhancing support for partners and clients across New Zealand’s Lower North and South Islands. Read...Newslink ©2025 to ITBrief |  |
|  | | RadioNZ - 4 Sep (RadioNZ) Multiple children have been killed or seriously injured in the lower North Island in recent months, but police say that is sadly not unusual. Read...Newslink ©2025 to RadioNZ |  |
|  | | Stuff.co.nz - 29 Aug (Stuff.co.nz) A strong wind watch was in place for parts of the lower North Island, while parts of the north were in for thunderstorms, heavy rain, and hail. Read...Newslink ©2025 to Stuff.co.nz |  |
|  | | NewstalkZB - 28 Aug (NewstalkZB) Wellington commuters can expect more disruption on the beleaguered Transmission Gully, as work`s done to patch up a stretch of the Lower North Island highway for up to half a year.
The Transport Agency is planning to re-surface and rebuild several kilometres of the road north of Porirua, likely meaning lane closures during the day, and full closures at night.
The work`s forecast to go from roughly October until March.
It comes just three and a half years after the $1.25 billion highway opened after years of delays, and relates to a legal battle with one of the road`s builders over unfinished work and quality issues.
The agency settled the matter out of court.
NZTA Regional Manager Mark Owen said the work`s not unexpected, but part of the road has deteriorated faster than expected, and concedes it will be frustrating for drivers over virtually the entirety of summer.
`At the moment there are some sections that are a little bit rough, and the chipsealing`s not always the most waterproof,` he said.
`[The road] was finished acceptable for people to use, but it wasn`t complete.`
NZTA is still finalising its plan for the work, and is expected to announce a schedule and cost over the coming week or so.
Owen concedes it`s frustrating and asks drivers to be patient, but sees this as the last major hiccup before the highway`s finally completed.
`It`s going to take a little bit of time ... we`ve got an intensive programme to fix it so it lasts its life cycle.`
A proposal for Transmission Gully`s speed limit to be increased to 110km/hr is also being considered, but would likely have to wait until after this work. Read...Newslink ©2025 to NewstalkZB |  |
|  | | Stuff.co.nz - 20 Aug (Stuff.co.nz) A person was taken to hospital with serious injuries after a fourth shooting incident in the small lower North Island town this week. Read...Newslink ©2025 to Stuff.co.nz |  |
|  |  |
|
 |
 | Top Stories |

RUGBY
The Canterbury rugby team are expecting another torrid home knockout as they host Hawke's Bay in the second NPC semifinal tonight, to see who'll play Otago in the final More...
|

BUSINESS
The rising cost of food is also affecting chocolate with popular Kiwi brand Whittaker's increasing its prices More...
|

|

 | Today's News |

 | News Search |
|
 |
 |
|
 |